We have completed the works on gas turbine and steam turbine stations to meet the energy needs of the operation. We are still constructing stations between 0,5 (MWe) and 25 (MWe).
We have now a group of gas turbine station which has 550 KWe alternator output power and three steam turbine group that has 750 KWe alternator output power. Gas turbine group is in operating condition. We have completed the maintenance and revision of one of the steam turbine group. Fluid, solid and gas fuel boiler and other equipments (condenser and cooling tower) will be prepared and ready to operation.